IMG_1303

Working our way underneath an old farmhouse (formerly the Country Daisy) built on beams and a sandstone foundation that caved on the north side. We replaced this with a new concrete wall, dug the room out to be used as a storage/utility room and poured a new floor.

IMG_0042

Cutting a doorway between Vintage & Rustics (old Ben Franklin building) and their new addition (old Kickin Ass Hat Shop).

Vintage Rustics Steel Beams

After all that cutting this doorway received double steel headers, one for each wall that was cut through as two buildings became one.

Vintage Rustics Finished Wood

Props to Mark Leesburg for finishing out his own doorway with vintage and rustic looking wood plank.

Vintage Rustics Ramp Hat Side

We poured a concrete ramp between the buildings in the new Vintage & Rustics since the floors were different heights.

Craning dirt sled EMCMC Grouphome

Craning out the dirt from underneath one of Eastern Montana Mental Health's group homes. We excavated and shored up this building to create new crawlspaces underneath for new sewer and a new foundation and drainage system.

IMG_1284

One of 3 sections of Neva's Place group home shown with crawlspace excavated awaiting a new footing and foundation wall.

IMG_0005

New wall (1 of 3) installed and grade brought up proper elevation for maximum drainage.

IMG_1080

Cutting one of 58 openings through grout filled block, rebar and brick at the MCC dorms for a/c units installed by Jerry's Refridgeration Services (JRS) and Glader Electric.

rockwells

Rockwell window wells are an attractive fiberglass alternative to typical steel wells and the built in step eliminates the need for an additional ladder!

IMG_0002

Cutting yet another egress window hole. We do a lot of these!

IMG_0117

Basic wood trimmed casement window.

Craning Spreader Bar Concrete Well

Craning an exposed aggregate concrete window well into place with our Bobcat E42 excavator.

F800 Drivers side wide

Our F800 dump truck is ready to haul our machines and your materials!

4068536010

PO Box 344

©2018 BY MILESTOWN CONSTRUCTION INC. PROUDLY CREATED WITH WIX.COM

IMG_0005

New wall (1 of 3) installed and grade brought up proper elevation for maximum drainage.